跳到主要内容

科罗拉多太阳能项目

Black Hills Energy – Colorado Electric is proud to offer customers an opportunity to have solar for your home or business. 当你安装太阳能系统时, you will receive two meters – a production meter 和 a net meter – Any excess energy produced by your solar system is retuned to Black Hills Energy Power Grid. Excess energy is added to your banked energy for use in future months. 

资格

  • You must be receiving electric service in Southern Colorado from Black Hills Energy.
  • Your account must be active 和 current at the site of the proposed installation.
  • All equipment must meet the minimum st和ards of UL 1741 和 the Institute of Electrical 和 Electronics Engineers in effect at the time of purchase.
  • 的 proposed 太阳能 system shall be sized to supply no more than 200 percent of the customer's reasonable 和 expected annual electricity consumption (measured in kWh) at that site. Use our limited usage table (below) for customers with less than 6 months of usage history available.

限制使用表

住宅面积(平方英尺) 年用电量(千瓦时) 100%容量(W) 120%容量(W) 200%使用率(W)
500平方英尺 3,199 1,927 2,313 3,854
501 - 100平方英尺 4,548 2,740 3,288 5,480
1001 - 1500平方英尺 6,071 3,657 4,389 7,314
1501 - 2000平方英尺 7,333 4,417 5,301 8,835
2001 - 2500平方英尺 8,433 5,080 6,096 10,160
2501 - 3000平方英尺 9,092 5,477 6,573 10,954
3001 - 3500平方英尺 10,000 6,024 7,229 12,048
3501 - 4000平方英尺 10,907 6,570 7,885 13,141
4001或更多平方英尺 12,455 7,503 9,004 15,006

开始

我们建议客户阅读程序规则, 和他们的太阳能邻居谈谈, 联系几家有资质的太阳能安装承包商. Industry professionals will help you decide the size 和 type of system that will best meet your needs 和 obtain the necessary permits 和 inspections.

Black Hills Energy works 关闭ly with third party solar developers however we cannot directly recommend solar developers. 的 科罗拉多州太阳能工业协会, COSEIA, maintains a list of qualified Colorado solar installation contractors with the training 和 experience necessary to properly design 和 install your solar system.

我们也鼓励你考虑以下建议. 

问正确的问题

Asking the right questions 和 carefully reviewing solar developer responses will help you make an informed decision when choosing the right company 和 will help ensure a successful solar installation project. 

  • 贵公司从事太阳能行业有多久了? 
  • Can you provide refences 和 examples of past solar projects you’ve completed?
  • 你们的安装人员和技术人员有执照和认证吗?
  • What warranties are offered to cover solar panels, inverters 和 other components?
  • Is t在这里 a maintenance plan included in the contract 和 what are the terms?
  • 你能为我的房产解释一下太阳能系统的设计吗, 包括面板放置和方向?
  • 估计的银河官网产量和系统效率是多少?
  • What is the total cost of the installation including all associated fees 和 equipment?
  • 你能帮我了解一下政府有什么激励措施吗, 税收抵免, 或者我项目的回扣? 
  • What is the estimated timeline for the installation, from start to finish?
  • 审批程序预计需时多久?
  • Is t在这里 a system monitoring solution in place to track the performance of my solar system?
  • 我如何访问和解释这些数据?
  • What is the process for reporting 和 addressing system issues or failures?
  • Are t在这里 any additional costs associated with maintenance or repairs?
  • Can you provide a detailed contract outlining all terms 和 conditions? 
  • Do you have liability insurance to cover any damages to my property during installation?
  • Do you guarantee a minimum level of energy production or system performance?
  • What happens if the system doesn’t meet the expected performance levels?
  • What are the precures 和 costs associated with removing the system if necessary in the future?
  • How can I reach your team for support 和 inquiries during 和 after installation?
  • 你们是否定期银河官网网址提供项目进展情况?

住宅和商业太阳能装置

All installations in this class will require a design 和 inverter review by the Company (i.e., 计量和逆变单线, 及DER的铭牌数据, 逆变器和断开开关.

Each application will be reviewed to verify that it is certified 和 applied in a manner consistent with its certification. 

的 installation must be permanently wired into a suitable load center in accordance with the National Electric Code (NEC). A lockable disconnect switch that is readily accessible to the Company’s personnel must be provided. This switch is to be at the metering point unless an alternate location is readily accessible 和 easily identifiable. 的 Company must approve the alternate location 和 a durable map or written sign will need to be provided at the metering or PCC location indicating the location of the switch.

费用: $380.00
保险要求: 1兆瓦或以下的太阳能装置,没有保险要求.
 

All installations in this class will require a design 和 relay review by the Company (i.e., 计量和继电器单线, 保护和控制原理图, 继电器设定表, nameplate data of the DER(s) 和 breaker(s) or like equipment 和 disconnect switch(es).

Certified test reports will be provided to the Company by the Customer upon request. 

Installations in this size range may be an assembly of multiple certified interconnection packages. 这是PV站点的常见做法. 的 certification process certifies the design 和 functionality for only the package with its associated energy source. It does not address the increased system impacts that multiple units will have. 正因为如此, a site with multiple packages must be reviewed in aggregate 和 additional protective equipment 和 field-testing will likely be required.

费用: $760.00
保险需求: 1兆瓦或以下的太阳能装置,没有保险要求.
 

2023-2026年可再生银河官网标准合规计划

PBI 2023 - 2026

激励 allocations 和 Rebates will be made available in proportional capacity quarterly.

激励方案0.5kw - 25kw

Income Qualified (IQ)和 Disproportionately Impacted (DI) Participants 

可用年容量 

250000瓦 

激励 
太阳能和储能  

PBI = $ 0.038千瓦时

1美元/瓦太阳能系统返利付款

$100/kW配对储能系统返利付款. 最高1000美元.每位客户00回扣

激励计划
0.5kw - 25kw

可用年容量 

1750000瓦

激励

太阳能和储能  

PBI = $ 0.0025 /千瓦时

$100/kW配对存储系统返利. 最高1000美元.每位客户00回扣

激励计划 
25kw - 250kw

可用年容量 

250000瓦

激励

太阳能

  PBI = $ 0.02 /千瓦时

IQ和DI的法定定义见(sb21 -272)